POST POUR REMEDIAL WORKS

Hydro demolition: Saving New Builds from Pouring Mistakes

Speak to the UK’s leading hydrodemolition contractors about the most effective and accurate way to remove concrete.

A concrete pour gone wrong can be a costly and time-consuming setback for any project. Traditional methods of concrete removal can often damage surrounding structures and lead to further delays and expenses.

Hydro demolition offers a versatile solution to salvage these situations. By utilising high-pressure water jets, this technique enables precise removal of excess or defective concrete, minimising damage to the underlying structure.

Key Benefits of Hydro demolition for New Build Remedial Works:

  • Precision Removal:
    Hydro demolition allows for targeted removal of concrete,ensuring that only the necessary portions are removed. This minimises the risk of damaging sound concrete and reinforcement.

  • Minimal Vibration:

    The vibration-free nature of hydro demolition reduces stress on the structure, preventing further damage and ensuring the integrity of the remaining concrete.

  • Environmental Friendliness:
    As a chemical-free process, hydro demolition minimises environmental impact. The water used in the process can be easily filtered and recycled, reducing waste and conserving resources.

By choosing hydro demolition, projects can salvage new builds, minimise downtime, and reduce overall costs.

  • Rapid and Efficient:

    Rapid and Efficient: Hydro demolition offers a quick and efficient method for concrete removal, accelerating project timelines and reducing overall costs.

  • Versatility:
    Hydrodemolition can be used to address a wide range of post-pour issues, including uneven surfaces, incorrect formwork, and structural defects.

LATEST COMPANY NEWS: