February 7th, 2020
Case Study: Concrete Silo Repair and Renovation
Contract No: 02/513/6864 Client: Balvac Location: Glasdone Dock, Liverpool Value: TBC Summary: Works Completed Background This project consisted of the repair and conservation of seven concrete wheat silos in Glasdon Dock. The silo’s were built in the 1970’s and in […]
April 12th, 2019
Case Study: Worsley Delph Restoration
Contract No: 02/838/7013 Client: Casey Construction Location: Worsley, Manchester Value: TBA Summary: Job Completed Background 1.3m restoration scheme in partnership with Salford City Council to restore Worsley Delph. The project is supported by the HLF and will enable this Scheduled […]
April 12th, 2019
Case Study: Church Scar Sea Defence
Contract No: 02/611/7002 Client: VBA Location: Lytham Value: TBA Summary: Job Completed Background The main contractor is VBA, a joint venture between VolkerStevin, Boskalis Westminster and Atkins are replacing the sea defence walls, as the existing coastal defences are time […]
December 4th, 2018
Case Study: Shopping Centre
Contract No: 02/811/7007 Client: Undisclosed Location: Manchester Value: TBA Summary: Job Completed Background A National Flue Lining Contractor had been awarded a project to install 1 x 96m x 425mm and 3 x 96metre x 475mm diameter Furanflex thermo-setting resin […]
October 23rd, 2018
Case Study: The Greyhound Bridge
Contract No: 02/501/6877 Client: AE Yates Location: Lancaster Value: TBC Summary: 245m³ of Concrete Removed Background Greyhound Bridge carries the A683 (Greyhound Bridge Road) over the River Lune. It was constructed in 1911 as a railway viaduct and converted to […]
October 22nd, 2018
Case Study: King George Dock Hydro Demolition
Contract No: 02/611/06398 Client: Volker Laser Location: Hull Docks Value: Works Ongoing Summary: 3 year Milestone Reached Background Built predominantly as a suspended quayside, North Quay consists of a series of bays on which cranes stand to unload cargo. The […]