October 23rd, 2018
Case Study: The Greyhound Bridge
Contract No: 02/501/6877 Client: AE Yates Location: Lancaster Value: TBC Summary: 245m³ of Concrete Removed Background Greyhound Bridge carries the A683 (Greyhound Bridge Road) over the River Lune. It was constructed in 1911 as a railway viaduct and converted to […]
October 22nd, 2018
Case Study: King George Dock Hydro Demolition
Contract No: 02/611/06398 Client: Volker Laser Location: Hull Docks Value: Works Ongoing Summary: 3 year Milestone Reached Background Built predominantly as a suspended quayside, North Quay consists of a series of bays on which cranes stand to unload cargo. The […]